Trade Price
£97.07
Per
1
Unit
EACH
Pack Quantity
1
Modules mount from front into grid support frames. Individually removable without disturbing grid. Conform to BS EN 60669-2-3. Multiple way soft start time delay switch Push operated delay pre-set for 3, 10 or 30 minutes. 40 - 400 W. Not suitable for fluorescent loads.
Finish
White
Frequency (Hz)
50/60
Mounting
From front into grid yokes
Power (W)
40 - 400
Standards
BS EN 60669-2-3
Voltage rating (V~)
100 - 240